| 2-28-01 Tape
outlines and
colors |
4-2-01 Platform
construction |
| 4-22-01
Platform
finishing touches and addition of second column |
4-28-01
Painting |
| 5-4-01 Finished
painting and
fixed squeak in platform |
5-18-01 Carpet was
too small
(oops), furring strips started, wires run for rope lighting. |
| 5-28-01 Still
waiting on carpet,
added furring strips and extra wires. |
6-3-01 Added some of
the polyester
batting for the upper section of the walls. |
| 6-9-01 Finished the
batting
on the walls, got the carpet installed and closed off the two back
windows.
Almost done with the sound-board. |
6-10-01 Installed
the wire
for the rear speakers and some boards for mounting the brackets. |
| 6-15-01 Installed
the rest
of the sound-board on the back wall, added the 45 degree strips for the
crown molding/light tray. Cleaned up after myself after taking the mess
picture. |
6-23-01 Today I
finished the
sound board on the screen wall, rounded the corners on the column that
I made on the right hand side and painted the whole thing flat black. |
| 6-24-01 I cut the
speaker
panels, then I added the 4oz. batting to the bottom layer of the room. |
7-1-01 The cat has
been clipped,
so now I start with the fabric. I started installing the black fabric
today,
after I added some strips for mounting the screen to. Yesterday I added
some baseboard to the bottom of the right column so it would match the
left. |
| 7-7-01 I finished the
front
wall, except for trim. |
7-8-01 We installed
the fabric
on the top portion of the room. I also got the trim for the front wall
and painted it before I install it. |
| 7-13-01 Trimmed out
the screen
wall |
7-14-01 Heater vent
and cold-air-return
added. |
| 7-22-01 Back at it.
Screen
fram installed, fabric installed on the bottom. |
7-28-01 I went and
purchased
the wood trim. |
| 7-29-01 I stained
some of
the trim, and I finished the front panels for my new speakers. |
8-3-01 Working on the
trim,
rope lighting and getting the screen material installed. |
| 8-7-01 The projector
has arrived! |
8-10-01 I worked on
my new
speakers today |
| 8-11-01 Started
putting up
the trim, got the baseboard and crown molding done as well as the rope
light. |
8-18-01 Projector is
hung. |
| 8-21-01 The sconces
are up
and we have sound (boom box) |
8-25-01 and 8-26-01
The blinds
are in, and the speakers are being worked on. I borrowed a Pro-Logic
receiver
from a friend. |
| 9-2-01 The blinds
have been
taken apart, painted, re-assembled and installed. |
9-3-01 The rear
speakers have
been completed and installed, the new center channel is being worked on. |
| 9-7-01 Center channel
speaker
is complete. |
9-8-01 The chair rail
is installed
as well as the door and some of the window trim. |
| 9-9-01 The corner
pieces and
some extra window trim were installed and some of the nail holes filled. |
9-18-01 Couches are
here |
| 9-21-01 Wood trim is
almost
complete, Grafik Eye and Windows are trimmed out. Dish is installed and
hooked up with HD! |
9-24-01 The new
cables are
here for Component output to the projector. What a difference a cable
makes! |
| 9-27-01 Shakers are
mounted
to the couches and they are ready to be moved. |
9-29-01 Couches are
in, whew!
Wires to the projector are all run in the ceiling now. |
| 10-15-01 The doors
are painted,
and will be covered in fabric later. |
10-31-01 The
equipment rack
is now complete. |
| 11-3-01 The sub is
in place,
and thumping! |
11-17-01 Minor
details, new
shaker amp. |
| 12-28-01 Playing a
borrowed
PlayStation 2, until I decided if I want a PS2 or an X-Box or the
Gamecube. |
1-12-02 We picked up
some
matching colored M & M's at the M & M store in Vegas. |
| 1-25-02 Hooked up my
other
sub to try it, also installed the surge protecting outlet for the
projector. |
2-2-02 New images of
the overall
room. These are wide angle views taken with a 35mm camera. |
| 2-20-02 The second
Titanic
1000 sub is in and installed. |
2-24-02 Finally,
treating
the first of the two doors, so it matches the rest of the room. |
| 3-1-02 Finished both
doors. |
3-17-02 The speakers
are now
covered in black. |
| 10-4-02 The reel
tables are
almost done. |
10-10-02 The reel
tables
are done and installed |
| 11-16-02 The
projector is
now vented to the attic |
1-22-04 Pics of the
new equipment
rack in progress |
| 1-26-04 More new
rack pics |
1-30-04 The new rack
is done
and installed |
| 2-12-04 Good pics of
the new
rack |
1-1-06 I re-did the
DVD storage closet shelving
|
| 1-31-06
I built a
new candy rack |
8-4-06
The old projector has been replaced!
|
9-30-06
Started on the new subwoofer
|
10-05-06
progress on the dual-sub
|
10-10-06
Now the dual-sub is a single sub.....
|
10-19-06
I got my new sub driver in today
|
10-22-06
Single sub assembly
|
10-27-06
More progress on the sub. Getting closer.
|
10-29-06
The box is now sealed up and the woofer mounted.
|
11-17-06
The fabric is on the sub and there are feet on it.
|
11-19-06
The new sub is in the theater!
|
2-25-07 New sub amp installed
and running
|